University of California
UCnet
What are you looking for?

Physical Plant Scheduler

Class Specification – G.15
Physical Plant Scheduler – 8157

August, 1974

Class Concept

Under general supervision, incumbents schedule work among the various shops of the Physical Plant Department; review work orders and accompanying plans, material lists, etc.; based on information regarding manpower, tools, equip ment, material availability, current work load, priorities and deadlines, and working within the overall calendar and man-~our estimates established in the work order, incumbents schedule starting and completion dates for each specified work operation to be performed by the various shops; schedule work for concurrent performance where possible, or in the most effective sequence to ensure required progress of shop operations; maintain scheduling board; hold weekly scheduling meetings with shop craft supervisors or lead personnel; and perform other related duties as required.

Minimum Qualifications

Ability to read, write and perform basic arithmetic calculations; five years of experience in building or mechanical craft trades, at least three of which should be at the operational level; and knowledges and abilities essential to the successful performance of the duties assigned to the position.